Calendar.connectNextMonth

gulong connectNextMonth(T)(T callback, Flag!"After" after = No.After) if (isCallable!T && is(ReturnType!T == void) && (Parameters!T.length < 1 || (ParameterStorageClassTuple!T[0] == ParameterStorageClass.none && is(Parameters!T[0] : gtk.calendar.Calendar))) && Parameters!T.length < 2)

Connect to NextMonth signal.

Emitted when the user switched to the next month.

Parameters

callbacksignal callback delegate or function to connect void callback(gtk.calendar.Calendar calendar) calendar the instance the signal is connected to (optional)
afterYes.After to execute callback after default handler, No.After to execute before (default)

Returns

Signal ID